Thursday, March 31, 2016

Division One Events for Annual Forum Meeting in Nashville -- April 27-30, 2016

Division 1 has four events scheduled for the upcoming meeting in Nashville.
  1. Division 1 Planning Retreat – Wednesday, April 27th, 9:00 AM to 12:00 PM
Every year D1 holds a planning retreat to review what we have accomplished, brainstorm, and plan for the coming year.  This retreat is open to everyone.  Whether you are a seasoned veteran or a first time attendee, please come to the planning retreat if you are interested in becoming more involved in D1.

  1. Practicum on “Advocacy at Depositions” – Wednesday, April 27th, 2:00 to 5:00 PM
We have a terrific panel for our third practicum.  To access the flyer with details about this program and the speakers, please click on the following link:  Practicum on "Advocacy at Depositions". This event is designed to be suitable for both younger attorneys and more seasoned veterans who want to learn more about the art of advocacy.  The registration for this event is separate from that for the Annual Meeting.  Please click the link here for the registration.

  1. D1/D13 Social Event, BB King’s Blues Club, 162 2nd Avenue North, Nashville, TN – Thursday, April 28th, 7:30 PM


Following the Welcome Reception at the Annual Meeting, please join us for a casual, fun filled night of hearty appetizers, drinks, music, and good company. The mixer will be in a private room overlooking the river in the Riverfront Dining Room and at 9:00 pm the BB King's Blues Club All-Star Band will perform.

Price per person is $60 a ticket and includes 2 drinks. Please click the link here to view the invitation and details.




  1. D1 Breakfast Program – Friday, April 29th, 8:00 AM to 9:00 AM
Please join us on Friday morning for a panel discussion entitled “Developing and Presenting Expert Testimony:  The Long View.”


Additional Information:
                            
For more information on discounted pricing, please contact Tamara.Harrington@americanbar.org.

Wednesday, March 30, 2016

OCIP Liability Insurer Required to Indemnify Florida Contractor for $23M in Property Damage Arising Out of Defective Subcontractor Work

Jeffery R. Mullen, Associate, Pepper Hamilton LLP

Pavarini Construction Co. v. Ace American Insurance Co., 2015 U.S. Dist. LEXIS 151247 (S.D. Fla. Oct. 29, 2015)

This action arose out of a construction project to build a 63-story luxury condominium tower located in Miami, Florida (“Project”). Pavarini Construction Co. (“Pavarini”) was the general contractor for the construction of the Project.  Pavarini hired a subcontractor for the installation of the concrete masonry unit walls and certain reinforcing steel, and a second subcontractor for the supply and installation of reinforcing steel within the cast-in-place concrete columns, beams, and sheer walls. The work performed by both of these subcontractors was deficient. A significant amount of reinforcing steel was either omitted entirely or improperly installed, including within important concrete structural elements, resulting in destabilization throughout the building. This, in turn, caused stucco debonding and cracking on the walls of the building, worsening cracking of cast-in-place concrete elements, and cracking in the mechanical penthouse enclosure on the roof, which led to water infiltration.

In December of 2010, upon becoming aware of the deficiency, the owner served Pavarini with a formal demand to repair all of the damage. Pavarini completed the work, incurring more than $25 million in costs relating to the remediation effort, including amounts paid to: consultants to investigate the damage and design a plan of remediation; install hurricane netting to prevent bodily injury and additional property damage; install a structural steel exoskeleton and a metal panel façade to provide the required structural support in the absence of functional steel beam;, and repair the mechanical penthouse enclosure on the roof.

Pavarini sought indemnification through the Project’s Owner Controlled Insurance Program (“OCIP”) designed to provide the owner, Pavarini and its subcontractors with uniform insurance coverage for claims of property damage and bodily injury. The OCIP included a commercial general liability policy issued by American Home Assurance Company (“American Home”) containing a $2 million per occurrence limit, and a first-layer umbrella policy issued by ACE American Insurance Company (“ACE”) containing a $25 million per occurrence limit. American Home ultimately acknowledged coverage, but ACE refused to pay for any costs associated with the repairs. After accounting for the $2 million recovered from the American Home policy and related salvage efforts, Pavarini brought suit against ACE seeking over $23 million in damages.

The parties filed cross-motions for summary judgment on, among other issues, whether the damage caused by the defective work of Pavarini’s subcontractors was covered under the policy. While the amount was undisputed, the parties disputed the nature and character of the loss. Pavarini claimed that none of the costs included the repair of defective work itself; rather all repairs were of damage to otherwise non-defective building components. ACE countered that much of the repair effort amounted to a de facto repair of the defectively installed steel.

The Court agreed with Pavarini, holding that the property damage caused by the subcontractors’ defective work to other property was covered under the policy.

The policy defined “property damage” as “all physical injury to tangible property, including all resulting loss of use of that property,” and included “[l]oss of use of tangible property that is not physically injured.” The policy excluded from coverage, in relevant part, “[p]roperty damage to ‘your work’ arising out of it or any part of it and included in the products-completed operations hazard.” This exclusion is known as the “your work” exclusion.  However, the “your work” exclusion did not apply “if the damaged work or the work out of which the damage arises was performed on your behalf by a subcontractor.” Thus, the policy provided coverage for damage to the completed Project caused by subcontractors’ negligent work, but did not provide coverage for the repair of the defective subcontractor work itself.

The question before the Court, therefore, was whether the subcontractors’ defective work caused covered “property damage.” Answering in the affirmative, the Court held that the complete replacement of defective subcontractor work may be covered when necessary to effectively repair ongoing damage to otherwise non-defective work. The Court found that because the subcontractors’ defective work caused cracking in the stucco, collapse of the penthouse enclosure, and cracking in the critical concrete structural elements, Pavarini was entitled to coverage for the repair of that non-defective work. And the Court found that in order to adequately repair the non-defective Project components, the building had to be stabilized. Even if the predominant objective of the repair effort was to fix the instability caused by the subcontractors’ defective work, the Court reasoned that the same effort was required to put an end to the ongoing damage to otherwise non-defective property, e.g., damage to stucco, the penthouse enclosure and critical concrete structural elements.

Consequently, the Court entered partial summary judgment in favor of Pavarini, holding that ACE was contractually required to reimburse Pavarini for the costs incurred.

Article originally posted March 14, 2016 on Constructlaw, an update and discussion of recent trends in construction law and construction, maintained and edited by Pepper Hamilton's Construction Law Practice Group. 

Friday, March 25, 2016

In Massachusetts, Arbitration Agreement Cannot Change Standard of Review

In Katz Nannis & Solomon, P.C. v. Levine, the Supreme Judicial Court of Massachusetts concluded that parties to an arbitration agreement cannot change the statutory standard of judicial review. 


The underlying dispute involved shareholders in an accounting firm. The subject agreement delineated the shareholders' professional association and relationship.  When three of the shareholders determined to terminate the fourth, the ousted shareholder challenged the involuntarily termination under the agreement.  At the arbitration, the award favored the three shareholders with the determination that the fourth was properly terminated.  The award was confirmed in Superior Court and the motion for new trial and relief from judgment was denied.  The shareholder appealed.

The shareholder's challenge to the arbitrator's award and the confirmation of the award was that the arbitrator misinterpreted the agreement.  And because the arbitration clause of the agreement  provided for judicial review of an award to determine whether there was a "material, gross and flagrant error" by the arbitrator, the shareholder argued that the court could consider the merits of his claim. "He reasons that arbitration is strictly a creature of contract, that the aim of the [Massachusetts Arbitration Act (MAA)] is to enforce the parties' contractual agreement to arbitrate, and that, therefore, the parties' agreed-upon standard of judicial review should be enforced."


The Katz Court disagreed.   It recounted that the MAA requires "[u]pon application of a party, the court shall confirm" an arbitration award unless "grounds are urged for vacating or modifying or correcting the award" as provided in §§ 12 and 13. M.G. L. c. 251, § 11. Per § 12, the court shall vacate an award if it "was procured by corruption, fraud or other undue means," or "the arbitrators exceeded their powers." G. L. c. 251, § 12 (a) (1), (3). 


As for the contractual argument--that the parties have a right to decide their own terms--the Court referred to the seminal case Hall St. Assocs., L.L.C. v. Matell, IncIn Hall St, the Supreme Court of the United States, held that under the Federal Arbitration Act "the statutory grounds are the exclusive grounds for judicial review and parties are unable to contract otherwise."  That said, the Court also held that the states can reach different conclusions.  In Massachusetts, however, the Court determined that following Hall Street was the proper result.

Wednesday, March 16, 2016

Nevada Supreme Court Finds Waiver of Right to Arbitrate Based on Separate, But Related Litigation

The Nevada Supreme Court recently ruled that a party defendant waived its right to compel arbitration due to its litigation conduct in a separate, but related litigation.  The court also clarified Nevada jurisprudence regarding whether the court or arbitrator should decide if a party waived its right to compel arbitration by that party’s litigation activities.  While not a construction case, Nevada courts might apply the same principles in pending construction matters, so the case is instructive.

Principal Investments, Inc. v. Harrison, 2016 WL 166011 (Nev. 2016), concerned a class action for fraud against a payday loan company and its process server related to default judgments the company obtained in prior litigations using affidavits of service allegedly falsified by the process server.  The loan company defendant sought to compel the class action plaintiffs to arbitrate their claims based on arbitration provisions in the loan documents.

After discussing the general criteria Nevada courts apply to determine whether the court or the arbitrator should decide waiver, the court determined that courts presumptively should decide issues of waiver based on litigation activities, “unless the arbitration agreement clearly commits the question to the arbitrator.”  Id. at *1.  While the loan agreements at issue provided that issues regarding the validity, scope, enforceability, and applicability of the arbitration clauses were subject to arbitration, the court did not find “clear and unmistakable intent” by the parties to arbitrate issues of waiver based on litigation activities.  Id. at *7. 

Regarding the merits of the waiver, the court found that the loan company’s litigation activities in the prior litigations in which the company obtained the default judgments against the plaintiffs waived the company’s right to demand arbitration of the plaintiffs’ current claims.  The court acknowledged prior jurisprudence and that “only prior litigation of the same legal issues as those the party now wants to arbitrate results in waiver of the right to arbitrate.”  Id. at *8.  However, the court found that “[t]he claims the named plaintiffs have asserted in district court arise of, and are integrally related to the litigation Rapid Cash conducted in justice court.”  Id. at *9.  The court also stated the arbitration agreements “should not be applied to sanctify a fraud upon the court allegedly committed by the party who itself elected a litigation forum for its claim.”  Id.

A copy of the decision is linked here.

Under Construction -- Paper, Online, or Both? The Forum wants to hear from you!



Last year, the Governing Committee approved publication in paper of Under Construction, the ABA Forum on Construction Law's newsletter, for 1 year (3 paper editions).

The Governing Committee will be considering whether Under Construction should remain in paper or be published only online.  

The Forum would like to hear from its members as to how they would like to receive Under Construction. The survey consists of 10 questions and will take you 5 minutes or less to complete.  

Under Construction is always looking for contributions from its members.  In fact, in the Spring 2016 edition, the Under Construction editors challenged each Division to submit something for each of the 3 editions of Under Construction.  

Division 1 submitted articles for both the Winter 2016 edition (Brendan Carter and Daniel Kapner) and Spring Edition (Dan Valentine and Jim Cohen).  The Valentine/Cohen article was a compilation of their series originally published on The Dispute Resolver!  

Thank you for your time and feedback!

Tom Dunn
Associate Editor, Under Construction 
rtdunn@PierceAtwood.com

Wednesday, March 9, 2016

Division 1 Social Event: BB King's Blues Club Nashville (4/28/2016 at 7:30PM)


Following the Welcome Reception at the Annual Meeting, please join us for a casual, fun filled night of hearty appetizers, drinks, music, and good company. The mixer will be in a private room overlooking the river in the Riverfront Dining Room and at 9:00 pm the BB King's Blues Club All-Star Band will perform.

Price per person is $60 a ticket and includes 2 drinks. Please click the link below to view the invitation and details.


We look forward to seeing you there!!




Friday, March 4, 2016

Advocacy at Deposition: Division 1's Advocacy Workshop (4/27/2016, Nashville, TN)








YOUNG LAWYERS CONSTRUCTION PRACTICUM – Advocacy at Deposition
April 27, 2016; 2:00 P.M. – 5:00 P.M.

Many construction cases are either won or lost during the deposition phase of discovery. Depositions provide an opportunity to not only learn about your opponent’s case, but also to establish the key facts you will need for dispositive motions and/or trial and to evaluate your clients and opponents testimonial demeanor. Please join us for a practicum with a team of nationally-recognized construction attorneys who will discuss the art of advocacy when taking and defending discovery depositions.

Topics will include:

• Preparing your client for deposition.
• Preparing to take the deposition of an adverse witness.
• “The Deposition Dance” – how to avoid using your outline as a crutch so you get what you need from a witness.
• Taking and defending Rule 30(b)(6) depositions.
• The ethical and legal boundaries relating to defending depositions.
• Special considerations for expert depositions.
• Closing the loop – What to do after the deposition has been concluded.

Speakers:

Leadership Circle: John Vento, Trenam Law, Tampa, Florida
Division 1: Rob Ruesch, Verrill Dana, LLP, Portland, Maine
YLD: Tamara Lindsay, Coates Rose, New Orleans, LA
Presented By: Division 1 – Litigation and Dispute Resolution; Young Lawyers Division; and the Forum Leadership Circle.

SEPARATE REGISTRATION FEE: $50/PERSON

Brochure: http://bit.ly/1R5qLim 
Register: http://bit.ly/1Kq0NEJ

Tuesday, February 23, 2016

Federal Court in Indiana Permits City to Sue Design Subconsultant Despite Lack Of Privity

Jane Fox Lehman, Associate, Pepper Hamilton LLP

City of Whiting, Indiana v. Whitney, Bailey, Cox, & Magnani, LLC, 2015 U.S. Dist. LEXIS 150229 (N.D. Ind. Nov. 5, 2015)

The City of Whiting, Indiana (the “City”) contracted with American Structurepoint, Inc. (“Engineer”) to design a lakefront park that would protect its shoreline from erosion (the “Project”).  Engineer subcontracted with Whitney, Bailey, Cox, & Magnani, LLC (“Subconsultant”) to serve as the marine engineer for the Project (the “Subcontract”).  Pursuant to the Subcontract, Subconsultant designed a revetment to protect the Project shoreline.  The revetment failed, damaging the City’s property and necessitating remediation.

Engineer assigned to the City any claims Engineer might have had against Subconsultant relating to the Subcontract and the revetment failure.  The City then sued Subconsultant, asserting three counts as Engineer’s assignee, and asserting breach of the Subcontract, negligence, and negligent misrepresentation in its own capacity.  Subconsultant filed a motion to dismiss, arguing that the City’s complaint failed to state a claim.

The district court granted Subconsultant’s motion in part and denied it in part.  The court first observed that Indiana law both permitted assignment of claims and recognized the causes of action the City asserted through the assignment.  While the City had erred by pleading that it sought to recover “its own damages” through these causes of action, the liberal federal pleading rules “do not countenance dismissal of a complaint for imperfect statement of the legal theory supporting the claim asserted.”  The court denied Subconsultant’s motion to dismiss the causes of action the City asserted through the assignment.

The court next explained that the City’s claim for breach of the Subcontract, which the City asserted on the theory that it was a third party beneficiary of the Subcontract,  survived Subconsultant’s motion to dismiss if the City had shown clear intent by Engineer and Subconsultant to directly benefit the City.  Intent could be shown by Subcontract language.  The Subcontract specifically named the City as the recipient of Engineer’s services, obligated Subconsultant to assist Engineer with those services using a professional standard of care, and incorporated the terms of Engineer’s contract with the City.  The court denied Subconsultant’s motion to dismiss the City’s claim for breach of the Subcontract.

Turning to the City’s negligence count, the court concurred with Subconsultant’s position that Indiana’s “economic loss rule” precluded the City’s ability to recover in tort for “disappointed contractual or commercial expectations,” which included any damage to the Project.  The City’s complaint alleged that it had suffered extensive damage to its “property at the Project, including the . . . pavilion, gazebo, and fishing pier.”  The court held that, regardless of whether damage to the pavilion, gazebo, and pier constituted damage to the Project, the City’s allegations had not foreclosed its ability to recover for damage to other property because the word “including” signified a non-exhaustive list.  The court denied Subconsultant’s motion to dismiss the City’s negligence count.

Finally, the court observed that Indiana recognized the tort of negligent misrepresentation, and that it may be actionable even when a plaintiff has suffered only economic loss.  However, Indiana’s economic loss rule precluded the owner of a construction project from recovering in tort for pure economic loss caused unintentionally by design professionals with whom the owner is connected through a network of contracts.  The City and Subconsultant were connected through a network of contracts, and nothing about the facts of the parties’ dispute warranted the court creating an exception to the rule.  The court granted Subconsultant’s motion to dismiss the City’s negligent misrepresentation count.

Article originally posted February 14, 2016 on Constructlaw, an update and discussion of recent trends in construction law and construction, maintained and edited by Pepper Hamilton's Construction Law Practice Group. 

Monday, February 22, 2016

Additional Insured Status for General Contractors

Today, we have a post regarding insurance coverage from Division 1 member Stephen Wright of the Atlanta-based law firm of Taylor English Duma LLP.


Stephen Wright of Taylor English Duma LLP
Stephen has a business background, having received his degree from Indiana University in Business Economics. His practice is not entirely construction-based, but his advice to clients on insurance issues relates across the board.

In the post that follows, Stephen outlines the ins and outs of the "your work" exclusion on a typical comprehensive general liability policy. Perhaps unsurprisingly, even with the same policy language, that exclusion is not applied consistently in all states.

New Twists: As General Contractor, Are You Protected as an "Additional Insured"?


By Stephen L. Wright

Let’s say you’re a general contractor on a commercial project and you’ve had your subcontractors give you certificates of insurance that identify your company as an “additional insured” under the subcontractors’ general liability policy.  So you’re covered in the event your subcontractors’ work causes some type of damage, right? Think again.

It all depends upon which state law applies. If you’re in Connecticut, you’re in luck. If the general contractor is in Georgia, not so much. But in either case, the wording of the specific insurance policy can make the difference.

The distinction between the states turns on a typical exclusion found in all comprehensive general liability policies involving construction companies. The “your work” exclusion states in essence that there is no insurance coverage if the damages are to the contractor’s own work. The thought here is that this is really a contract risk and the contractor needs to be careful in the performance of its own work. But how does this exclusion apply when the general contractor is an additional insured on a subcontractor’s policy?

It probably comes as little surprise that there is disagreement as to how these two provisions should interrelate. In Connecticut, the state Supreme Court recently found that the policy was only intended to relate to the subcontractor’s own scope of work such that damage to other parts of the project caused by a subcontractor’s defective work could be the basis of a claim by the general contractor.  

By contrast, in Georgia a recent court decision found that the scope of “your work” is determined from the perspective of the party making the claim so that a general contractor would have the exclusion apply to the entirety of the project. The court found that to find otherwise would make the insurer a guarantor of the subcontractor’s performance. The Connecticut court rejected this conclusion and pointed out that performance bonds guarantee a much broader spectrum of subcontractor failures as opposed to insurance which just focuses on defective work.

Bottom line: be aware of what the law of the state in which the project is located provides and make sure that the specific policy language of the “your work” exclusion says what you need it to say. There is no one standard way of phrasing this exclusion and each insurer can have its own individual approach.

Stephen L. Wright is a Partner with Taylor English Duma LLP in Atlanta. 

Friday, February 19, 2016

LEED Appeals





In this second post about LEED, we briefly review the achievement categories for construction projects.  Then we take a look at LEED appeals and challenging whether credits within the categories were fulfilled.

As discussed in the post #1, LEED is a rating system for sustainable and efficient building, which achievement level—denoted by platinum, gold, silver, and certified—may be a requirement in the project specifications or a condition for funding.  The level is determined by points (up to 110 are available) earned in several categories.  The categories are often interrelated.  For example, the location selected can affect energy options including harnessing renewable power.  The universal categories (there are also regional categories) and brief examples of strategies for generating points follow:
  •  location/transportation – (16 points) – develop areas near pre-existing roads/infrastructure and already developed surfaces to limit urban sprawl and avoid occupying green space, develop at a high priority sites like a brownfield, locate near public transportation, incentivize carpooling; provide electric car recharging services;
  • sustainable sites – (10 points) - use native plants in landscaping, limit size of the building footprint by building upward to protect open space and habitats, minimize lighting or use screened or timed units, install pervious surfaces, collect and use rainwater for landscaping or even process water; use reflective or light-colored roofs or roof gardens and reduce paved surfaces to avoid heat absorption;
  • water efficiency – (11 points) - limit water use by installing efficient plumbing valves and restrictors, use dual flush or low flow toilets, use rainwater as process water, monitor water use to manage consumption, use drought-tolerant plants in landscaping, install high-performance irrigation systems;
  • energy/atmosphere – (33 points) - incorporate natural air sources through appropriate venting or harness wind energy, use solar energy and sunlight for some or all building power sources, insulate walls and the roof to conserve energy, give due consideration of size demands of the use and build appropriately, select high-performance appliances, lighting, and HVAC, design appropriately sized HVAC loops for heating and cooling;
  • materials/resources – (13 points) - reuse building materials, rely on efficient framing spacing to use less material, use local materials to reduce travel emissions, use renewable, recycled, long-lasting, prefabricated materials, adopt streamlined recycling and waste programs;
  • indoor environmental quality – (16 points) - design systems to filter air as it enters the building; test for radon, avoid building materials that emit volatile organic compounds; design ingress/egress to limit particulates collection from outside, use pest control that does not rely on chemicals; 
  • innovation – (6 points) – credit is given for a cutting edge methodology even if it exceeds or does not fit into a specific category.

LEED certification process begins when a project team registers its application online.  (For guidelines on the entire application process, see the LEED Certification Guide). The team provides all necessary information about the project and documentation to establish the various credits.  The U.S. Green Building Council’s Green Building Certification Institute (“GBCI”) reviews the application, allows for supplemental clarifications during the “Preliminary Review,” and then provides a “Final Review” that states whether and to what level the project will receive LEED certification. 

At that point, the owner or project team has 25 days to appeal the credit decisions contained in the Preliminary Review.  Called the “Appeal Review,” the project team may amend their application with respect to single credit or seek out additional credits not previously submitted for review.  Generally the original reviewer will respond to the appeal.  This appeal process may be raised for a single credit or multiple credits and may be repeated without limit. However, each credit addressed is considered its own appeal and requires payment of its own appeal fee.  Interestingly, the appeal fee is greater depending on the complexity of the credit.  While this “Appeal Review” process is unlimited to the project team (a change from the 2012 version of LEED guidelines wherein an Appeal Board had the final say on credits), it may suffer from its new Laissez-faire approach.  For example, a formal review from an uninterested and qualified panel (or reviewer) is highly important when a credit decision is questioned.  As presently set up, the same reviewer who rejected the credit maybe the same person to review the appeal.

A variation of the “Appeal Review,” the project team also has the option of pursuing Credit Interpretation Rulings (CIR), which are project specific, or LEED Interpretations, which set precedents for all projects.  The CIR process invites the project team to seek out technical guidance related to a particular credit or facet of the LEED rating system. LEED Interpretations tend to ask similar questions as CIRs, but may be more complex or, in the LEED estimation, is worthwhile to use as precedent.  The difference between a CIR /LEED Interpretation and the Appeal Review described above appears to be the timeframe and breadth of appeal.  Appeal Review is necessarily during the application process, whereas the other two may be accomplished before application.  Appeal Review appears focused on sufficiency of backup for a credit as opposed to the technical guidance or the LEED regulations as a whole.

On the flipside of the project team’s appeals and interpretations is the “Certification Challenge.”  This policy is intended to ferret out “incidents of intentional or inadvertent misrepresentation which result in the inappropriate award of LEED certification.”  See the LEED Certification Guide.  Essentially it is an audit process that may initiated by the GBCI president for “any reason or no reason at all” within 18 months of LEED certification.  The GBCI may also proceed with a Certification Challenge if a third party with “specific personal knowledge” comes forward with a complaint.  In either case, there is an investigation by GBCI and an opportunity for the project team to be heard.  Upon an adverse determination, the project team may appeal to the GBCI Board of Directors.  In the event of an adverse decision before that board, the decision is final, and the LEED certification may be revoked.

Final Post: We will examine considerations in construction contracting in this green-building era aimed at avoiding disputes on a sustainable project.  For example, the AIA has adopted its own guide and contract language.  See AIA D503.
 ---------------------------------------
The author, Katharine Kohm, is a committee member for The Dispute Resolver. Katharine practices construction law and commercial litigation in Rhode Island and Massachusetts.  She is an associate at Pierce Atwood, LLP in Providence, Rhode Island.  She may be contacted at 401-490-3407 or kkohm@PierceAtwood.com.