▼

Tuesday, November 25, 2014

Download the Forum on Construction Law's App

At the Fall Meeting in Chicago, the Forum on Construction Law released its new application.  At the meeting, the application had all speaker and event information a couple of clicks away.  It is amazing that over the past 5 or so years, the Forum has moved from large books filled with the resource material, to CDs (which required you to bring your laptop), to applications and thumb-drives that you can place in your wallet. Impressive stuff.


If you have not downloaded the Forum's application, Division 1 encourages you to do so.   Information is below:


Apple Store Users can download the App from: https://appsto.re/us/UOUl3.i


Android Users the App can also be downloaded from: https://play.google.com/store/apps/details?id=net.manageapps.app_69899


There is a ton of information on the Forum's App, including links to:


  • Membership Directory (lists sorted alphabetically, by region, and by division)
  • Searchable Knowledgebase
  • Division information
  • Midwinter Brochures
  • Forum publications


The format of the App will revert back to a "meeting app" for the mid-winter meeting so now is a great time to download the App and become familiar with it. 

No comments:

Post a Comment